Appels d'offres › Fédéral
Rainbow Lake FireSmart Project
Forestry and Parks · 25 more open tenders from this buyer →
✨ Résumé en langage clair
Ce qu'on recherche, qui peut soumissionner, date limite, exigences et liste de vérification pour soumissionner ou non — en anglais, en français, en farsi, en pendjabi, en chinois et dans bien d'autres langues.
🧰 Outils de soumission IA
Rédigez votre soumission, voyez qui remporte habituellement ce type de travaux et trouvez des partenaires pour les volets que vous ne pouvez pas réaliser seul.
Commencez l’essai gratuit pour utiliser les outils de soumission
Forestry and Parks - Request for Proposal - Rainbow Lake FireSmart Project
Project Background – The Town of Rainbow Lake has experienced significant wildfire threats in recent years, including the Long Lake Fire just over two years ago. While the fire altered the landscape around the community, wildfire risk remains as the area continues to regenerate. Regrowth within the burned areas is creating new fine fuels that can dry quickly and provide an opportunity for fire to spread. There are also significant areas of standing dead and down trees left from the fire that will continue to dry and become heavier fuels, potentially increasing fire intensity and spotting during future wildfire incidents. With support from Alberta Forestry and Parks, the community has identified the need for continued FireSmart treatments and retreatments to address these changing fuel conditions. Ongoing treatment will help maintain previous FireSmart work, manage new regrowth and hazardous fuels, and maintain a more manageable landscape around the Town. This project will build on previous wildfire mitigation work and support a long-term approach to reducing wildfire risk to the Town of Rainbow Lake and its residents.
Project Objectives - Reduce overall surface fuel loading to decrease the intensity, rate of spread and potential for crown fires of any wildfire around the community. The treatment is designed to reduce the potential fire behaviour and increase the successful suppression opportunities in the forested area within and around the Town of Rainbow Lake. The treatments will decrease fuel loading along the West side of the community. For the project there will be three units treated. The units are F2 (10.5ha), Unit 26 (8.1ha), and Unit 23(3.32ha), a total of 21.92 ha’s. The project is most suited for Hand Crew with Mechanical Mulching. Fuel Types identified; Unit 26 - Mixed stand M2 50% F2 - M250%/C2 Unit 23 - M2 more than 50% conifer C2
Related Project Documents – Documents that will be included with RFP will be a PDF map of the Rainbow Lake 10yr FireSmart Plan.
Refer to RFP for submission details.
Addendum 01 - November 19, 2026 - Q/A
| Clôture | déc. 7, 2026, 16:00 HNE — 12 jours restants |
|---|---|
| Publié | 17 nov. 2026 |
| Numéro de sollicitation | 27TDRHFD804 |
| Référence | AB-2026-07566 |
| Catégorie | Services |
| Région de livraison | Alberta |
| Codes de biens et services (UNSPSC) | Protection contre les incendies ; Prévention des incendies ; Foresterie ; Gestion forestière ; Industrie forestière ; Services de conservation forestière ; Services d'enlèvement de bois ; Services environnementaux ; Services de prévention des incendies |
Avis officiel : https://purchasing.alberta.ca/posting/AB-2026-07566
Imprimé à partir de https://tenderbell.ca/tender/71408-rainbow-lake-firesmart-project
Contrats passés semblables
Qui a remporté des contrats fédéraux semblables, et pour quel montant.
Consultez tous les anciens adjudicataires, la valeur des contrats et les acheteurs : sachez contre qui vous soumissionnez et ce que le gouvernement a payé la dernière fois.
Commencer l'essai gratuit — Pro inclusVoir toutes les attributions de contrats similaires →
Qui remporte habituellement ce type de travaux
Contrats fédéraux pour des travaux similaires au cours des 5 dernières années.
Inclus dans le forfait Pro (49 $/mois) et dans l'essai gratuit.
Commencer l'essai gratuit