Tenders › Federal
AUC-26-12 Development of Regulatory Requirements for Waste Heat Recovery and Integration for Data Centres
Alberta Utilities Commission
✨ Plain-language summary
What they want, who can bid, deadline, requirements and a bid/no-bid checklist — in English, French, Farsi, Punjabi, Chinese and more.
🧰 AI bid tools
Draft your bid, see who usually wins this work, and find partners for the parts you can't do alone.
Alberta Utilities Commission - Request for Proposal - AUC-26-12 Development of Regulatory Requirements for Waste Heat Recovery and Integration for Data Centres
The purpose of this RFP is to retain a subject matter expert to develop filing requirements for data centres in Alberta with a total electrical demand of 10 megawatts (MW) or more. The requirements will address waste heat recovery and integration, thermal emissions characterization and thermal emissions impact assessment. This RFP is for waste heat recovery and integration (Task 1) and its associated Task 4 scalable requirements. Thermal emissions characterization and thermal emissions impact assessment (Tasks 2 and 3) are potential work that may become firm later. The expert will also advise the AUC on how to review applicant submissions. The background, objective and tasks are described in Section 2.
The deliverables will provide clear, practical and technically defensible filing requirements, assessment methods and acceptance criteria suitable for use in AUC regulation, including a scalable framework that reflects data centre size and environmental risk.
(a) The closing time and date for this RFP is 2 p.m. Alberta time on December 4, 2026.
(b) The proposal submission form (page two of the RFP) must be completed, signed by an authorized representative of the proponent and included with the proponent’s proposal.
(c) Submissions by email are preferred. The email submissions are to be sent as Microsoft Word or PDF files to Shaheer Akhlaq ([email protected]).
(d) The subject line of the submission email must read as follows: AUC-26-12 Development of Regulatory Requirements for Waste Heat Recovery and Integration for Data Centres – [Proponent Legal Name]. Submissions with an incorrect or missing subject line may not be identifiable and the AUC accepts no responsibility for submissions that cannot be linked due to an improperly formatted subject line.
(e) Only one submission per proponent will be accepted. Proponents must ensure their submission is complete and accurate before sending. Any subsequent submissions from the same proponent will not be accepted or evaluated.
(f) Submissions by facsimile will not be accepted.
| Closing | Dec 4, 2026, 16:00 ET — 9 days left |
|---|---|
| Published | Nov 20, 2026 |
| Solicitation number | AUC-26-12 |
| Reference | AB-2026-07671 |
| Category | Services |
| Delivery region | Alberta |
| Goods/services codes (UNSPSC) | Environmental standards; Environmental Impact Assessment EIA services; Environmental technology advisory services; Corporate objectives or policy development; Plant or facility infrastructure engineering; Mechanical engineering |
Official notice: https://purchasing.alberta.ca/posting/AB-2026-07671
Printed from https://tenderbell.ca/tender/100012-auc-26-12-development-of-regulatory-requirements-for-waste-heat-recovery-and-integration-f
Past contracts like this
Who won similar federal contracts, and for how much.
See every past winner, contract value and buyer: know who you're bidding against and what the government paid last time.
Start free trial — includes ProSee all similar contract awards →
Who usually wins this kind of work
Federal contracts for similar work in the last 5 years.
Included in Pro ($49/month) and in the free trial.
Start free trial