Forestry and Parks - Request for Quotes - Queen Elizabeth Provincial Park 2 - Water Line Replacement
PROJECT BACKGROUND: The distribution water line connecting pump house to the staff house and shop has suffered continuous failures due to its age.
PROJECT OBJECTIVE: Replace existing distribution water line to new 50mm HDPE from existing main CC valve at pump house to the existing CC valve at the shop by means of directional drilling. Replace existing distribution water line to new 50mm HDPE from existing main CC valve at pump house to the replaced CC valve at the staff house.
SCOPE OF WORK: Contractor is responsible for all necessary equipment, tradesmen, and supplies for the completion of the following scope of work:
1. Any required line locates are the responsibility of the Contractor.
2. Remove steel barrier posts in front of pump house and set aside for reinstalment.
3. Remove front concrete step at pump house and set aside for reinstalment.
4. Partially excavate down to main CC valve, using a step downside method of embankment then expose CC valve along with both existing water line connections by means of hydro-vac. This procedure to be used on all three CC valves.
5. Directional drill new 50mm HDPE water line with 12-gauge wire tracer wire from pump house to existing CC valve in front of the shop.
a. All existing fittings and connections will be replaced on existing CC valves.
6. Directional drill new 50mm HDPE water line with 12-gauge tracer wire from pump house to replaced CC valve on east side of the staff house.
7. All existing fittings and connections will be replaced on existing water line from staff house to the replaced CC valve.
8. Pressure test to be completed to the closed existing and replaced CC valves (x3) for a min of 15 minutes, repeated again to the opened CC valves (x2 shop and house) for min of 15 minutes.
9. Once pressure test is confirmed all excavations to be brought up over grade for settlement.
10. Reinstall Barrier posts level, with a minimum of 4’ above ground, similar height prior to removal.
11. Reinstall concrete apron with 97% compaction to the grade material – material to be provided by Alberta Forestry and Parks.
12. Existing water lines except for staff house CC valve will not be removed and all line locates to be completed by Alberta Parks with site map included with RFQ.
Refer to the RFQ document for additional information.
Submit Quotes by email to the address indicated, Attention: Robert McGhee - include the RFQ Title and ID number in the subject line of your email.
Refer to the RFQ for specific instructions on submitting a Quote - please read carefully to ensure all required information and documentation is included in your submission.
| Closing | Nov 30, 2026, 16:00 ET — 5 days left |
|---|---|
| Published | Nov 6, 2026 |
| Solicitation number | 27PAR656 |
| Reference | AB-2026-07396 |
| Category | Services |
| Delivery region | Alberta |
| Goods/services codes (UNSPSC) | Specialized trade construction and maintenance services; Pipefitting fabrication and maintenance services |
Official notice: https://purchasing.alberta.ca/posting/AB-2026-07396
Printed from https://tenderbell.ca/tender/71065-queen-elizabeth-provincial-park-2-water-line-replacement
Past contracts like this
Who won similar federal contracts, and for how much.
See every past winner, contract value and buyer: know who you're bidding against and what the government paid last time.
Start free trial — includes ProSee all similar contract awards →
Who usually wins this kind of work
Federal contracts for similar work in the last 5 years.
Included in Pro ($49/month) and in the free trial.
Start free trial