Tenders › Federal

8 days leftAlberta (APC)Invitation to Bid

Bridge Culvert Replacement and Other Work - BF 76203

Municipal District of Pincher Creek No. 9

✨ Plain-language summary

What they want, who can bid, deadline, requirements and a bid/no-bid checklist — in English, French, Farsi, Punjabi, Chinese and more.

Start free trial to use AI summaries

🧰 AI bid tools

Draft your bid, see who usually wins this work, and find partners for the parts you can't do alone.

Start free trial to use the bid tools

Municipal District of Pincher Creek No. 9 - Invitation to Bid - Bridge Culvert Replacement and Other Work - BF 76203

Sealed Tenders for the replacement of an existing bridge culvert along a local road over Ernst Creek will be received by Municipal District of Pincher Creek No. 9 at [email protected] until:

11:00:00 am, Alberta MST, December 3, 2026

This project will involve the removal and disposal of an existing single 2490 mm (span) x 1750 mm (rise) x 20.1 m long corrugated steel pipe (CSP) arch, and the supply and installation of one (1) new 2700 mm diameter x 32 m long CSP at Bridge File 76203 carrying a Local Road over Ernst Creek near Maycroft, AB (NW 26-10-03 W5M). Due to the environmental constraints, instream work must occur between August 16, 2027 and August 31, 2027.

The scope of work for this project includes, but is not limited to the following:
− Mobilization
− Site Occupancy
− Traffic Accommodation (Staged Construction)
− Care of Water
− Fish Capture & Release
− Total Suspended Solids Testing
− Removal and Disposal of Existing Culvert Structure
− Structural Excavation
− Supply & Installation of one (1) 2700 mm diameter x 32 m Corrugated Steel Pipe
− Granular Backfill & Non-Granular Backfill
− Supply and Install Class 1 and Class 2 Heavy Rock Riprap
− Roadway Work
− Supply and Install Brush Layering
− Supply and Install Straw Rolls
− Other Work

Digital copies of the plans and specifications may be obtained for free by downloading them from www.purchasingconnection.ca or www.buildworkscanada.com.

For technical or engineering information, contact Levi Ober, P.L.Eng., at [email protected].

Tender documents will be available for download at 11:00 am, Local Time, November 19, 2026. Tenders must be accompanied by a bid bond in the amount of ten percent (10%) of the total sum tendered.

The Owner reserves the right to reject any or all tenders. The lowest or any other tender will not necessarily be accepted.

Submit tender documents to [email protected]

ClosingDec 3, 2026, 13:00 ET — 8 days left 📅 Add to calendar
PublishedNov 19, 2026
Solicitation number241043
ReferenceAB-2026-07650
CategoryConstruction
Delivery regionAlberta, Municipal District of Pincher Creek No. 9
Goods/services codes (UNSPSC)Bridge construction and repair service

Official notice: https://purchasing.alberta.ca/posting/AB-2026-07650
Printed from https://tenderbell.ca/tender/92578-bridge-culvert-replacement-and-other-work-bf-76203

Past contracts like this

Who won similar federal contracts, and for how much.

Trail 70 Pedestrian Bridge Replacement ,Gatineau Park
Moderne Vision Inc · GATINEAU, Quebec
National Capital Commission (NCC)
$162,677May 13, 2025
Culvert Replacement - North Tetsa River Bridge Culvert No. 5, Km 597.2 Alaska Highway, BC
Online Constructors Ltd. · Abbotsford, British Columbia
Public Works and Government Services Canada
$542,827Jul 31, 2014
3 more contract awards — Pro plan

See every past winner, contract value and buyer: know who you're bidding against and what the government paid last time.

Start free trial — includes Pro

See all similar contract awards →

Who usually wins this kind of work

Federal contracts for similar work in the last 5 years.

DEXTER CONSTRUCTION CO. LTD.
· last win Jul 27, 2026
35 wins$186,822,701
Simex Defence Inc.
Pointe-Claire, Quebec · last win Oct 26, 2026
21 wins$1,634,775
See all 6 top competitors — Pro plan

Included in Pro ($49/month) and in the free trial.

Start free trial